PROJECT PLANNING / BUYER TOOL
Clock System Specification and RFQ Template
Turn your building requirements into a clear request for quotation. Use a blank clock schedule, a requirement checklist and a supplier response table to request comparable proposals.
Enter what your site needs, keep unknowns visible and ask suppliers to identify the exact configuration behind their offer.
Get the blank templateRead the filling guideONE PROJECT / ONE REQUIREMENT SET
Define. Compare. Confirm.
1. Record the site and clock locations.
2. Separate requirements from supplier responses.
3. Resolve open points before ordering.
01 / BLANK TEMPLATE
What should my clock system RFQ contain?
A useful RFQ records the project scope, clock quantities, display needs, available infrastructure and the evidence requested from each supplier. Keep buyer requirements separate from proposed product capabilities so that an unanswered field is not mistaken for an accepted specification.
The blank template covers project details, a clock schedule, time and display requirements, site infrastructure, supplier responses, responsibilities and quotation information. All project values are left for you and your suppliers to complete.
Download blank RFQ template (DOCX)
3 pages. Editable in a compatible word processor. Save your own copy, complete the blank fields and add rows as needed. No sign-up required.
Use the same revision for every supplier. Mark each requirement Required, Optional or To be confirmed. Do not insert assumed accuracy, viewing distance, certification, price or delivery commitments.
02 / FILLING GUIDE
How do I describe the project and count the clocks?
Start with the buildings, floors and locations to be served, then count complete clock assemblies separately from their visible faces. Create a separate schedule row whenever the display, mounting, power supply or installation environment changes.
Project information
- Project reference, revision and responsible contact role.
- Country, delivery destination and site time zone.
- New installation, replacement or extension.
- Buildings and floors included in the quotation.
- Requested response date and desired delivery date.
A desired delivery date is a buyer request. Ask the supplier to state its proposed lead time and dependencies separately.
Clock schedule
- Location or zone and required number of units.
- Number of visible faces per assembly.
- Analog or digital display and required information.
- Wall, ceiling or other mounting arrangement.
- Available power and indoor or outdoor conditions.
A dual-sided assembly has two viewing faces. State both unit and face totals rather than using the two counts interchangeably.
Which display and site details should I provide?
Describe what users must see and the conditions at each planned mounting location. Record the available network and power as site facts, while leaving the proposed model and its verified capabilities for the supplier to identify.
| Field | What to enter | What to confirm |
|---|---|---|
| Display | Analog or digital; hours and minutes or hours, minutes and seconds; any requested date or message area. | Exact format, dimensions, colour and optional functions. |
| Visibility | Viewing positions, approximate distances, lighting and obstructions. | Suitable digit or dial size for the location. |
| Mounting | Space, mounting surface, orientation and access constraints. | Dimensions, brackets and installation responsibility. |
| Power | Power at each position, PoE availability and any requested backup scope. | Configuration requirements and switch power capacity. |
| Network | Ethernet or Wi-Fi availability and responsible IT contact role. | Compatible time source, approved access and configuration responsibilities. |
| Environment | Indoor or outdoor location, exposure and cleaning conditions. | Suitability of the proposed enclosure and configuration. |
For architecture choices, see synchronized clock systems. For model dimensions and catalogue information, use the download centre.
How should I write the time and acceptance requirements?
State the time that each area should display, the available or requested time source and the performance that your project needs. Ask the supplier to explain how the proposed configuration meets those requirements, with supporting documents and an agreed verification method.
- Time reference: identify the existing service or record that a new source is required.
- Distribution: describe the intended communication method or request a proposal based on site infrastructure.
- Local time: record the time zone and daylight saving behaviour.
- Acceptance target: state the display deviation, comparison reference and measurement method, or mark them for agreement.
- Interruption and recovery: describe the need during network or power interruption and ask for supported behaviour.
PoE describes power delivery; it does not by itself specify the time synchronization protocol. Keep requested message functions, network monitoring and backup arrangements separate so that each can receive its own response.
Leave an unknown technical value blank or mark it To be confirmed. A requested target is not proof that a particular model meets it.
How do I make supplier quotations easier to compare?
Give each requirement an identifier and ask every supplier to respond against the same list. Record the proposed model, configuration, supporting evidence and any exception beside each response, rather than relying on a single statement that the whole system is compliant.
| Requirement ID | Buyer requirement | Supplier response | Evidence / exception |
|---|---|---|---|
| ________ | ________________ | ________________ | ________________ |
| ________ | ________________ | ________________ | ________________ |
Useful response labels are Confirmed with evidence, Proposed subject to confirmation, Not supported and Not assessed. A blank answer remains an open question.
Ask the quotation to identify equipment, accessories, options, configuration services, freight, currency, validity, payment terms, exclusions, warranty terms and lead time dependencies. Keep commercial values blank until the supplier provides its offer.
Which documents should accompany the RFQ?
Attach the information needed to understand the site, with a reference and revision for each file.
- Clock schedule and relevant layout drawings.
- Photographs of mounting positions, where permitted.
- Project specification and IT requirements.
- Acceptance requirements and requested product documents.
Only share material you are authorised to disclose. Do not include passwords, network credentials or unnecessary personal information.
Who supplies and installs each part?
Separate equipment supply from site work so that gaps are visible before an order.
- Clocks and mounting accessories.
- Time source and antenna accessories.
- Switches, network cabling and electrical supplies.
- Software or message management, if requested.
- Installation, testing and handover.
Record whether each item is included by the supplier, provided by the buyer or others, or still to be confirmed.
Ready to discuss your requirement list?
Review the open fields with your project team, then use the existing contact page or email info@syncclocks.com. Include your project reference, clock schedule and questions that still need a response.
For quick answers before preparing the full specification, visit our synchronized clock FAQ.