Procurement / blank buyer tool

Clock System Tender Clarification Log

Track conflicting requirements, formal answers and document revisions before a clock-system bid is submitted.

This blank log separates a question from an authorised answer. It is not a technical compliance certificate, a contract interpretation or a completed HC project record.

When should I use a clarification log?

Use it when a clock specification, drawing, clock schedule or quotation leaves a decision unresolved. A supplier response matrix records what is offered. A clarification log records the question, the authorised answer, and the document changes needed before that answer can be relied on.

Start initial requirements with the clock system specification and RFQ template. Use this separate log to resolve ambiguities. Carry the agreed revision into the technical submittal package.

Prioritise the questions that affect the bid

First identify issues that change equipment selection, supply responsibility, pricing or acceptance. Assign a due date early enough for the authorised reply and any revised quotation to be reviewed before the submission deadline. Minor wording changes should not hide a material unresolved requirement.

Clock-specific questions to check

  • Does backup apply to the timekeeping circuit, display, network equipment or the complete system?
  • What source-fallback behaviour is required, and what evidence will establish it?
  • Which interfaces are required, and who confirms compatibility?
  • Who supplies switches, cabling, antennas, brackets and commissioning?
  • Do quantities count complete assemblies or individual clock faces?

These are prompts for clarification, not claims about any model's functions.

Blank clarification log

Copy these fields into your own project document or spreadsheet. Use one record per decision. The entry column is intentionally blank; this page does not submit or store project information.

Blank clock-system clarification record
Field Your entry What to record
Project / log revision ________ Project reference, revision and issue date.
Clarification ID ________ A stable reference used in all later correspondence.
Source documents ________ Document title, revision, clause, page and drawing reference.
Question / conflict ________ The unresolved point, with quoted requirements kept separate from your interpretation.
Bid impact / priority ________ Scope, configuration, cost, delivery or acceptance affected.
Owner / due date ________ Responsible role and response deadline.
Submitted reference ________ Approved submission channel, question reference and date.
Official answer ________ Authorised issuer, reply reference, date and retained source location.
Required document changes ________ Every affected schedule, drawing, specification, scope list or quotation revision.
Closure evidence / reviewer ________ Answer and revised documents checked, reviewer and review date.
Status / next action ________ Open, Submitted, Answer received, Revision pending or Closed; identify any remaining action.

An answer received is not automatically an issue closed. Check that it addresses the question, that referenced addenda have been obtained, and that affected documents agree.

How to fill and close the log

  1. Locate the issue. Record exact source references and distinguish stated requirements from assumptions.
  2. Ask one answerable question. Explain the conflict and its bid impact without presenting a preferred answer as an established fact.
  3. Use the designated process. Submit through the project's approved channel before its deadline.
  4. Retain the answer faithfully. Record the issuer and reference. If it refers to an addendum, obtain that document rather than guessing its meaning.
  5. Reconcile the documents. Check clock schedules, interfaces, supply scope, acceptance requirements and quotation revisions against the authorised answer.
  6. Review closure. Record the reviewer and evidence. Keep unresolved questions open with a named next action rather than silently inserting an assumption.

Illustrative question wording

“Clause [reference] requests backup operation, while drawing [reference] shows external power. Please identify which functions must remain available during the interruption and the required verification method.”

This is an illustrative prompt, not a real project response. The technical answer stays blank until authorised evidence is available. No backup duration, model capability or test result is implied.

Why the question and answer must stay separate

A historical master-clock tender query asked about fallback and battery-backup interpretation. The official reply to item 323 referred back to the bid conditions; item 324 pointed to an addendum. Neither reply should be replaced with the bidder's proposed interpretation.

This example illustrates clarification handling, not HC product capability or a universal technical requirement. The referenced addendum is not reproduced or interpreted here.

Source: NDB-hosted Reply to Pre-Bid Queries 2B, 24 August 2020, printed page 55, items 323–324. This is a historical source, not a current invitation to bid.

The blank workflow above is editorial guidance. Follow your own project's current documents, designated authority and procurement process.

Common questions

Is a supplier email enough to close an issue?

Only treat a reply as authoritative when the project's process recognises its issuer and channel. Obtain the required formal revision where applicable, and retain the evidence used for closure.

Does this replace the compliance matrix?

No. Link the clarification ID to the affected requirement and supplier response. Keep the evidence for offered capability separate from the record of how the requirement was clarified.

What if an answer does not resolve the question?

Keep it open. Record the remaining issue, responsible owner and next action through the approved process. Do not convert an unexplained reply into a confirmed technical fact.

Does this confirm a SyncClocks model is suitable?

No. Request evidence for the exact model, configuration and interfaces being proposed. The clock systems overview is a starting point for a project discussion, not approval of a particular tender.